Sparkle K's | Construction Report

  • Strom trap on-site pre-construction meeting.

  • Glazer completed field measurements of openings

  • Masonry work of build completed.

  • Per installation meeting with Columbia Gas per location of gas supply from main to building.

  • Plumber coring and installed roof drain and overflow sets, 3 each.

  • HVAC contractor made roof penetrations of precast.