Strom trap on-site pre-construction meeting.
Glazer completed field measurements of openings
Masonry work of build completed.
Per installation meeting with Columbia Gas per location of gas supply from main to building.
Plumber coring and installed roof drain and overflow sets, 3 each.
HVAC contractor made roof penetrations of precast.